Das aktuelle Foto

Breaking News:
Beinschmerzen? Können Warnhinweis für Herzschäden und Infarktgefahr sein
Nachhaltige Infrastruktur-Lösungen begeistern auf der bauma 2025
Mütter verdienen mehr – Intelligente Geschenkideen zum Muttertag
WiseMo aktualisiert den Windows-Guest für die plattformübergreifende Fernwartung
Master of Engineering: Hochschule Kaiserslautern stellt Studienangebote vor
Kathmandu Nepal
Donnerstag, Mai 8, 2025
While still in their testing phase, the first operating turbines are already producing electricity, which is transferred to shore via an offshore transformation station and fed into the Dutch grid.
The wind farm is located in the North Sea about 18-35 kilometers off the coast between The Hague and Zandvoort and is owned by BASF, Vattenfall and Allianz.
So far, 36 turbines have been installed. When fully operational in 2023, Hollandse Kust Zuid will be the largest subsidy-free offshore wind farm in the world with 140 turbines and an installed capacity of 1.5 GW.
More information at:
https://www.basf.com/global/en/media/news-releases/2021/06/p-21-238.html
https://www.basf.com/global/en/media/news-releases/2021/09/p-21-297.html
https://www.basf.com/global/en/media/news-releases/2021/12/p-21-400.html
BASF SE
Carl-Bosch-Straße 38
67056 Ludwigshafen
Telefon: +49 (621) 60-0
Telefax: +49 (621) 60-42525
http://www.basf-ag.de