Start of construction for Energiequelle GmbH’s German repowering project in Minden
Breaking News:
Strategischer Ausbau: Nexus Uranium sichert sich 100 % Eigentum am Uranprojekt “Deadhorse”
Keine Scheu vor Transparenz – warum BPER Small ärztliche Messkompetenz sichtbar macht
LIR Life Sciences startet Tierstudie zur nadelfreien Adipositas-Therapie
Starker Auftritt in Wien: Deutsche Nordsee begeistert mit Küstenurlaub und Radreisetipps
Kathmandu Nepal
Samstag, Jan. 17, 2026
With a rotor diameter of 149 meters and state-of-the-art technology, the new turbines will generate approximately 40,000 megawatt-hours of electricity annually. This represents an increase of around 600 percent compared to the output of the original wind farm.
“The repowering in Minden is a strategic step toward securing the future. With fewer turbines, we generate significantly more power, ensuring maximum land-use efficiency,” says Jan Schrobsdorff, Project Manager at Energiequelle GmbH. In the future, around 9,500 four-person households will be supplied with sustainably produced electricity from the wind farm.
The project was planned in close coordination with the city of Minden and the relevant authorities. Approval was granted under the Federal Immission Control Act in December 2024. All three turbines are scheduled to be commissioned by the end of October 2026.
Energiequelle GmbH has been active in the renewable energy market since 1997.
The company plans, builds and operates wind energy and photovoltaic systems, transformer stations and energy storage facilities and develops innovative energy supply solutions. With over 600 employees at 28 locations in Germany, France, Finland, Poland, Greece and South Africa and more than 850 plants installed, Energiequelle is a leading company in the industry.
Energiequelle GmbH
Hauptstraße 44
15806 Zossen OT Kallinchen
Telefon: +49 (33769) 871-0
Telefax: +49 (33769) 871105
http://www.energiequelle.de
![]()