Odyssey of the Seas leaves building dock

Breaking News:
Goldshore Intersects 42.7m of 1.09 g/t Au at the Eastern QES Zone of the Moss Deposit
Abcourt schließt Kreditfazilität in Höhe von 8 Mio. US$ für den Start der Mine Sleeping Giant ab
Mustang Energy Corp. erhält Explorationsgenehmigung für das Uranprojekt 914W
Goldshore durchteuft 42,7 m mit 1,09 g/t Au in der östlichen Zone QES der Lagerstätte Moss
Kathmandu Nepal
Freitag, Juli 4, 2025
The ship then moors at the outfitting pier in the shipyard harbour. After the manoeuvre, the masts and chimney are lifted onto the ship by crane and installed. Various tests will then be carried out. The ship is expected to moor at the outfitting pier in the shipyard towards the evening.
Weather and/or production-related time changes during the float out of the ship are possible at any time.
At MEYER WERFT’s outfitting pier the interior work on the Odyssey of the Seas will be completed in the coming months. The ship will then be conveyed down the river Ems to complete the technical and nautical sea trials.
The 169,000 GT cruise ship has an overall length of 347.1 meters, is 41.4 meters wide and can accommodate more than 5000 passengers.
MEYER WERFT GmbH & Co. KG
Industriegebiet Süd
26871 Papenburg
Telefon: +49 (4961) 81-0
Telefax: +49 (4961) 81-4300
http://www.meyerwerft.com